Architectural and MEP modifications
Modifications that touch both the architecture and the building services, such as AC, plumbing, drainage, power and fire systems.
What's included
- Air-conditioning and ventilation changes
- Plumbing and drainage modifications
- Electrical load and distribution changes
- Fire alarm and fire fighting coordination
- Architectural changes linked to services
- Drawings, submissions and works
How it runs
- Project requirement
- Drawings
- Documentation
- Relevant authority process
- Permit-ready
- Execution and completion
Authorities that may apply
Which bodies apply depends on the property location and the scope.
Approvals are issued by the relevant authority. Scope and eligibility are confirmed per project; AECONIM CONTRACTING does not guarantee approvals.
Illustrative imageWhat we need from you
Documents typically requested for architectural and mep modifications. The exact list depends on the authority and property.
- Title deed or tenancy contract
- Existing MEP and architectural drawings, if available
- DEWA premise number or bill
- Landlord or developer NOC, if applicable
- Description of the required change
Check your project
Tell us about the property and the work. We reply on WhatsApp with what the project needs.
- Send your project details
- We review location, scope and authority
- We confirm the requirements and next steps
Prefer to talk?+971 58 555 6616